Hand rubbing nuclear fusion live in the wilderness
Chapter 482 Controllable Fusion Reactor Completion
Chapter 482 Controllable Fusion Reactor Completion
It is very easy to tame wild animals with the special food in the animal domestication knowledge information.
At least it was easy for the jaguar. Whether it was two female leopards or four cubs, after eating these snacks, they were much less vigilant towards him.
Especially the four little ones who ate one by one with their round bellies didn't say anything, and they didn't resist his stroking, and even the brave ones got under his hands, let him touch them, and came up to lick them on their own initiative.
The changes before and after, the audience in the live broadcast room were envious.
[Anchor, what are you talking about, your attitude has changed too quickly. 】
[Tsk tsk, sure enough, there is a mother who is a milk, and four snacks. 】
[It's absolutely amazing, use this kind of snacks to lure wild animals in the wild and catch one. 】
【so cute!He even touched his belly. 】
[When you were young, you saw them cute. When they grow up, they look cute at you when they are in a good mood, and they eat you one by one when they are in a bad mood. 】
[It seems that I want the anchor's formula, and I will give it to my cat. The jaguar is a cat, and my cat should be able to eat it. 】
[Upstairs, you can go through the previous live broadcast recordings. It seems that there are detailed configuration live broadcasts when the anchor broadcasts for the second time. 】
[Praise upstairs, I'll look for it later. 】
[Six jaguars, how much meat do they eat a day?The surrounding animals will suffer. 】
[No, did you forget that the anchor has a farm?Have as much meat as you want. 】
After petting the four little leopards, Han Yuan let them go, and let Leopard [-] and Leopard [-] take them to settle nearby.
Anyway, there is a breeding farm in the base, so there is no pressure to raise a few jaguars.
After letting go of a few jaguars, Han Yuan returned to the controllable nuclear fusion park without wasting any time, and started assembling the controllable fusion reactor again.
There are only more than four months left in the first year of the outer space exploration mission. He needs to complete the assembly and manufacture of the controllable nuclear fusion reactor and successfully generate electricity within these four months.
However, relying on the solar farms and small rivers currently deployed by the lake to generate electricity cannot support subsequent electricity consumption.
Not to mention anything else, just every time the large-scale particle collider is started, the power consumption is an astronomical figure.
Not to mention the huge power consumption of the entire base.
The days of assembling a controlled nuclear fusion reactor are dull and boring, but the heat in the live broadcast room has not dropped much.
Most of the audience will take time to come up to check in almost every day, and watch the increasingly large and round fusion reactor device by the way.
In the blink of an eye, more than two months have passed, and the controllable nuclear fusion reactor ushered in the final part of the assembly.
Although in this process, South Korea used some X-1 industrial robots to complete those repetitive tasks, such as the riveting of the first wall gamma-nickel alloy sheet, such as the deployment of the external superconducting clamping coil.
But it can still be seen that his work efficiency has directly reached the limit of human beings.
No one can maintain high-intensity work for more than 24 hours [-] hours a day like him.
If someone else came over, he would be so tired that he vomited blood within three days.
And this kind of work lasted for more than three months.
Being able to do such a high-intensity work is due to the double doubling of physical attributes twice, as well as the development and strengthening of the body by the human body development medicine.
Of course, for a commercialized controllable nuclear fusion reaction device for power generation, not only the core fusion reactor needs to be assembled, but countless other devices also need to be assembled.
For example, the magnetic fluid power generation equipment and paramagnetic spin power generation equipment deployed on the fusion reactor, or the control equipment, fire protection equipment, and raw material storage devices deployed in other rooms, all need to be installed and deployed.
There are many of these things, especially magnetic fluid power generation equipment and paramagnetic spin power generation equipment.
The total number of these two types of large-scale power generation equipment exceeds [-] sets.
These 2000 sets of power generation equipment are not small power stations, and the power generation of each set can reach [-]MW.
If you have no idea about this number, think about the former Three Gorges Power Station.
The Three Gorges Hydropower Station has a total of 32 70-kilowatt hydroelectric generating units installed, including 14 on the left bank, 12 on the right bank, 6 underground, and two 2-kilowatt power units, with a total installed capacity of 5 million kilowatts.
The conversion between megawatts and kilowatts is 1:1000, that is to say, the total installed capacity of the Three Gorges Power Station is 22500MW.
In other words, more than ten sets of magnetic fluid power generation equipment and paramagnetic spin power generation equipment can generate electricity that can reach the last Three Gorges Dam.
As for such power generation equipment, it is conceivable that its assembly is not easy. If he did it alone, he would not be able to complete it in a year or two.
Fortunately, the large-scale 3D printing factory has been completed, and these tasks can be handed over to the X-1 industrial robot.
With the backing of the printing factory, there are enough robots as labor to replace him to do these things, which greatly saves time.
It can be said that when he was assembling the controllable nuclear fusion reactor, more than fifteen hundred X-1 industrial robots worked together in the reactor building every day.
Only in this way can the overall construction be completed within three months.
When the last set of pipelines used to connect the fusion reactor and power generation equipment was deployed, the South Korean won officially declared that the controllable nuclear fusion reactor had been assembled.
Hearing this, the live broadcast room cheered.
【It's finally finished. 】
[In three months, the assembly of [-] parts can be completed. I can only say that the anchor is also a robot, and his body is made of iron. 】
[I'm afraid it won't work with iron, let me know about metal fatigue, brother. 】
[The next step is to light the fire, right? 】
[The time to witness the miracle is coming. 】
[If the reactor blows up when it is ignited, it will be a miracle. 】
[Fuck, can't you wait a little bit upstairs, okay? 】
[You said that if this controllable nuclear fusion is fully powered, how much electricity can it generate in a year? 】
[1000 billion degrees?I remember that the power generation of the Three Gorges Power Station in the last year before it stopped generating power was more than 100 billion kWh. 】
[Can a controllable nuclear fusion reactor be worth a Three Gorges?Don't make trouble, the impossible, okay?The installed capacity of the Three Gorges is more than 2000 million kilowatts. 】
[1000 billion degrees?Are you underestimating the controllable fusion reactor?This is a technology known as the ultimate energy source, and there is no problem adding a zero. 】
【one trillion?It's too exaggerated. You must know that our country's electricity consumption last year was only more than [-] trillion kilowatt-hours. So it only needs ten controllable nuclear fusions to supply electricity for the entire country?Kind of bullshit. 】
There was a lot of discussion in the live broadcast room, and ordinary viewers were very interested in how many degrees this controllable nuclear fusion reactor could produce in a year, and the discussions continued.
Looking at the barrage of these discussions, Han Yuan smiled and said: "This is a large-scale controllable nuclear fusion reactor, with a total of 63 sets of magnetic fluid power generation equipment and paramagnetic spin power generation equipment installed."
"And each set of magnetic fluid power generation equipment and paramagnetic spin power generation equipment has a generating power of about two gigawatts. You can calculate how much electricity this controllable nuclear fusion reactor can generate in a year."
Hearing this question, the audience in the live broadcast room discussed again.
[I know, I know, 63*2000=250! 】
[250 kWh electricity, good guy, the anchor is going to scold her. 】
[63*2000=126000MW, that is, 600 million kilowatt-hours of electricity, this power generation is a bit low. 】
[Good guy, can't you do a serious calculation? MW is a megawatt, and megawatts cannot be converted into kilowatt-hours of electricity, okay? , one is the unit of work and the other is the unit of power. 】
[One kilowatt-hour of electricity can make a 1000-watt electrical appliance work for one hour, that is, one kilowatt-hour, which can be regarded as a kilowatt-hour, and the ratio between a megawatt and a kilowatt is 1:1000. This calculation is still correct, as long as However, the upstairs will ignore the power generation. 】
[Madan, don't you know how to calculate it?How much electricity can this nuclear fusion generate in a year? 】
[63 groups, each group is 2000MW, that is, the installed capacity of 12 MW, and the total installed capacity of the Three Gorges Power Station is 2 MW, which is [-] times. Okay, let’s do the math next. ! 】
[Hiss~, it's so terrifying! 】
[5.6*1000 billion kWh, or nearly 6000 billion kWh? 】
There was chaos in the live broadcast room, and all kinds of squids ran out.
In contrast, experts from various countries are much calmer. After knowing the power generation efficiency of the generator set and the number of installed units, they can simply calculate the annual power generation of this controllable nuclear fusion reactor.
But after the data was calculated, everyone was taken aback.
According to the data mentioned by the anchor, if the controllable nuclear fusion reactor in front of me is running at full capacity, these 63 generator sets can generate more than 6000 billion kWh of electricity a year.
Calculated based on Huaguo's power consumption of [-] trillion kWh last year, the annual power generation of this controllable nuclear fusion reactor is close to [-]% of Huaguo's total electricity consumption last year.
This concept may be a bit vague, but if the electricity consumption of the provinces in Huaguo is ranked according to the year, it is almost exactly the electricity consumption of Dongshan Province in a year.
As for the electricity consumption of Dongshan Province, it ranks among the top five provinces in Huaguo, and a real power station can supply the electricity consumption of a province.
A controllable nuclear fusion reactor can supply such a huge amount of electric energy. From the outside world, it is unimaginable, but it is expected.
After all, it is a controllable nuclear fusion reactor, the legendary ultimate energy source, which can provide such a huge amount of electrical energy. Although it is surprising, it is also reasonable.
After briefly introducing the performance parameters of this controllable nuclear fusion reactor, Han Yuan ignored the audience in the live broadcast room. He began to direct the X-1 industrial robot to dismantle the brackets used for assembly and clean up the garbage on the site. wait for something.
The controllable nuclear fusion reactor and various power generation equipment have been assembled and deployed, and the next step is naturally to conduct power generation tests.
It is impossible for him to use it directly, and various necessary tests still need to be carried out.
Being able to skip the experimental reactor and build a commercial reactor directly, he had enough trust in the former host.
Of course, this has almost the same relationship with the materials left to him by the previous host and the format of knowledge information passed to him by the system.
As for the system, Won is still trustworthy.
It took two or three days, and under the busyness of many industrial robots, the support for assembling the reactor and all kinds of garbage in the reactor building have been cleaned up, including all kinds of boxes and tools.
The original messy reactor building looks much cleaner and tidy.
Standing on the highest floor of the plant and looking down, you can see a huge reactor lying on the ground like a doughnut.
Connected to the reactor are countless pipelines, most of which are used to generate electricity.
Some are connected to the magnetic fluid power generation equipment and paramagnetic spin power generation equipment in the floor, which can continuously convert the thermal energy provided by the controllable nuclear fusion reactor into electrical energy, and then output it to the entire base through the grid.
Some are used to import deuterium and tritium raw materials.
Another part is connected to the emergency device, waste discharge device and so on.
If we compare this reactor building to a person.
There is no doubt that the controllable nuclear fusion reactor located in the most central area is the heart, and every movement of the ultra-high temperature plasma in it brings vigorous energy to the whole body.
The central computer and intelligent core that control the magnetic mirror clamps and superconducting coils is the brain, which not only directs the flow of ultra-high temperature plasma, but also directs the operation and power output of the generator set.
Other devices are responsible for other parts of the human body.
For example, the liquid lithium circulation device arranged behind the first wall is like a lung, continuously providing new tritium raw materials, just like providing oxygen.
For example, the superconducting coils and magnetic mirror ferrules arranged on the controllable nuclear fusion reactor are like the arteries and veins of the human body, strictly controlling the flow of the 'blood' high-temperature plasma inside.
These things together form a colossus, making it glow with endless energy.
After cleaning up all the excess items in the reactor building, Won came to the control room.
Here, he can see everything in the entire controllable nuclear fusion park, every corner, including the cavity in the center of the fusion reactor, and as long as he wants, he can also see the data chart through the plasma detection technology.
All preparations and inspections had been done the day before.
Xiao Ling, who is in charge of controlling the entire park, checked every detail and confirmed that other equipment except the controllable nuclear fusion reactor can operate normally.
Including magnetic fluid power generation equipment and paramagnetic spin power generation equipment, they have all been tested for power generation through high-temperature plasma simulation equipment to ensure that there are no problems with the power generation unit and the power grid.
Now what Han Yuan has to do is to wait with the audience in the live broadcast room.
Almost all the rest will be done by Xiao Ling.
Manpower is sometimes poor at this moment is a best performance.
Although it can be said that he is now very strong both physically and mentally, but alone, he still cannot control the controllable nuclear fusion park, while artificial intelligence can.
(End of this chapter)
It is very easy to tame wild animals with the special food in the animal domestication knowledge information.
At least it was easy for the jaguar. Whether it was two female leopards or four cubs, after eating these snacks, they were much less vigilant towards him.
Especially the four little ones who ate one by one with their round bellies didn't say anything, and they didn't resist his stroking, and even the brave ones got under his hands, let him touch them, and came up to lick them on their own initiative.
The changes before and after, the audience in the live broadcast room were envious.
[Anchor, what are you talking about, your attitude has changed too quickly. 】
[Tsk tsk, sure enough, there is a mother who is a milk, and four snacks. 】
[It's absolutely amazing, use this kind of snacks to lure wild animals in the wild and catch one. 】
【so cute!He even touched his belly. 】
[When you were young, you saw them cute. When they grow up, they look cute at you when they are in a good mood, and they eat you one by one when they are in a bad mood. 】
[It seems that I want the anchor's formula, and I will give it to my cat. The jaguar is a cat, and my cat should be able to eat it. 】
[Upstairs, you can go through the previous live broadcast recordings. It seems that there are detailed configuration live broadcasts when the anchor broadcasts for the second time. 】
[Praise upstairs, I'll look for it later. 】
[Six jaguars, how much meat do they eat a day?The surrounding animals will suffer. 】
[No, did you forget that the anchor has a farm?Have as much meat as you want. 】
After petting the four little leopards, Han Yuan let them go, and let Leopard [-] and Leopard [-] take them to settle nearby.
Anyway, there is a breeding farm in the base, so there is no pressure to raise a few jaguars.
After letting go of a few jaguars, Han Yuan returned to the controllable nuclear fusion park without wasting any time, and started assembling the controllable fusion reactor again.
There are only more than four months left in the first year of the outer space exploration mission. He needs to complete the assembly and manufacture of the controllable nuclear fusion reactor and successfully generate electricity within these four months.
However, relying on the solar farms and small rivers currently deployed by the lake to generate electricity cannot support subsequent electricity consumption.
Not to mention anything else, just every time the large-scale particle collider is started, the power consumption is an astronomical figure.
Not to mention the huge power consumption of the entire base.
The days of assembling a controlled nuclear fusion reactor are dull and boring, but the heat in the live broadcast room has not dropped much.
Most of the audience will take time to come up to check in almost every day, and watch the increasingly large and round fusion reactor device by the way.
In the blink of an eye, more than two months have passed, and the controllable nuclear fusion reactor ushered in the final part of the assembly.
Although in this process, South Korea used some X-1 industrial robots to complete those repetitive tasks, such as the riveting of the first wall gamma-nickel alloy sheet, such as the deployment of the external superconducting clamping coil.
But it can still be seen that his work efficiency has directly reached the limit of human beings.
No one can maintain high-intensity work for more than 24 hours [-] hours a day like him.
If someone else came over, he would be so tired that he vomited blood within three days.
And this kind of work lasted for more than three months.
Being able to do such a high-intensity work is due to the double doubling of physical attributes twice, as well as the development and strengthening of the body by the human body development medicine.
Of course, for a commercialized controllable nuclear fusion reaction device for power generation, not only the core fusion reactor needs to be assembled, but countless other devices also need to be assembled.
For example, the magnetic fluid power generation equipment and paramagnetic spin power generation equipment deployed on the fusion reactor, or the control equipment, fire protection equipment, and raw material storage devices deployed in other rooms, all need to be installed and deployed.
There are many of these things, especially magnetic fluid power generation equipment and paramagnetic spin power generation equipment.
The total number of these two types of large-scale power generation equipment exceeds [-] sets.
These 2000 sets of power generation equipment are not small power stations, and the power generation of each set can reach [-]MW.
If you have no idea about this number, think about the former Three Gorges Power Station.
The Three Gorges Hydropower Station has a total of 32 70-kilowatt hydroelectric generating units installed, including 14 on the left bank, 12 on the right bank, 6 underground, and two 2-kilowatt power units, with a total installed capacity of 5 million kilowatts.
The conversion between megawatts and kilowatts is 1:1000, that is to say, the total installed capacity of the Three Gorges Power Station is 22500MW.
In other words, more than ten sets of magnetic fluid power generation equipment and paramagnetic spin power generation equipment can generate electricity that can reach the last Three Gorges Dam.
As for such power generation equipment, it is conceivable that its assembly is not easy. If he did it alone, he would not be able to complete it in a year or two.
Fortunately, the large-scale 3D printing factory has been completed, and these tasks can be handed over to the X-1 industrial robot.
With the backing of the printing factory, there are enough robots as labor to replace him to do these things, which greatly saves time.
It can be said that when he was assembling the controllable nuclear fusion reactor, more than fifteen hundred X-1 industrial robots worked together in the reactor building every day.
Only in this way can the overall construction be completed within three months.
When the last set of pipelines used to connect the fusion reactor and power generation equipment was deployed, the South Korean won officially declared that the controllable nuclear fusion reactor had been assembled.
Hearing this, the live broadcast room cheered.
【It's finally finished. 】
[In three months, the assembly of [-] parts can be completed. I can only say that the anchor is also a robot, and his body is made of iron. 】
[I'm afraid it won't work with iron, let me know about metal fatigue, brother. 】
[The next step is to light the fire, right? 】
[The time to witness the miracle is coming. 】
[If the reactor blows up when it is ignited, it will be a miracle. 】
[Fuck, can't you wait a little bit upstairs, okay? 】
[You said that if this controllable nuclear fusion is fully powered, how much electricity can it generate in a year? 】
[1000 billion degrees?I remember that the power generation of the Three Gorges Power Station in the last year before it stopped generating power was more than 100 billion kWh. 】
[Can a controllable nuclear fusion reactor be worth a Three Gorges?Don't make trouble, the impossible, okay?The installed capacity of the Three Gorges is more than 2000 million kilowatts. 】
[1000 billion degrees?Are you underestimating the controllable fusion reactor?This is a technology known as the ultimate energy source, and there is no problem adding a zero. 】
【one trillion?It's too exaggerated. You must know that our country's electricity consumption last year was only more than [-] trillion kilowatt-hours. So it only needs ten controllable nuclear fusions to supply electricity for the entire country?Kind of bullshit. 】
There was a lot of discussion in the live broadcast room, and ordinary viewers were very interested in how many degrees this controllable nuclear fusion reactor could produce in a year, and the discussions continued.
Looking at the barrage of these discussions, Han Yuan smiled and said: "This is a large-scale controllable nuclear fusion reactor, with a total of 63 sets of magnetic fluid power generation equipment and paramagnetic spin power generation equipment installed."
"And each set of magnetic fluid power generation equipment and paramagnetic spin power generation equipment has a generating power of about two gigawatts. You can calculate how much electricity this controllable nuclear fusion reactor can generate in a year."
Hearing this question, the audience in the live broadcast room discussed again.
[I know, I know, 63*2000=250! 】
[250 kWh electricity, good guy, the anchor is going to scold her. 】
[63*2000=126000MW, that is, 600 million kilowatt-hours of electricity, this power generation is a bit low. 】
[Good guy, can't you do a serious calculation? MW is a megawatt, and megawatts cannot be converted into kilowatt-hours of electricity, okay? , one is the unit of work and the other is the unit of power. 】
[One kilowatt-hour of electricity can make a 1000-watt electrical appliance work for one hour, that is, one kilowatt-hour, which can be regarded as a kilowatt-hour, and the ratio between a megawatt and a kilowatt is 1:1000. This calculation is still correct, as long as However, the upstairs will ignore the power generation. 】
[Madan, don't you know how to calculate it?How much electricity can this nuclear fusion generate in a year? 】
[63 groups, each group is 2000MW, that is, the installed capacity of 12 MW, and the total installed capacity of the Three Gorges Power Station is 2 MW, which is [-] times. Okay, let’s do the math next. ! 】
[Hiss~, it's so terrifying! 】
[5.6*1000 billion kWh, or nearly 6000 billion kWh? 】
There was chaos in the live broadcast room, and all kinds of squids ran out.
In contrast, experts from various countries are much calmer. After knowing the power generation efficiency of the generator set and the number of installed units, they can simply calculate the annual power generation of this controllable nuclear fusion reactor.
But after the data was calculated, everyone was taken aback.
According to the data mentioned by the anchor, if the controllable nuclear fusion reactor in front of me is running at full capacity, these 63 generator sets can generate more than 6000 billion kWh of electricity a year.
Calculated based on Huaguo's power consumption of [-] trillion kWh last year, the annual power generation of this controllable nuclear fusion reactor is close to [-]% of Huaguo's total electricity consumption last year.
This concept may be a bit vague, but if the electricity consumption of the provinces in Huaguo is ranked according to the year, it is almost exactly the electricity consumption of Dongshan Province in a year.
As for the electricity consumption of Dongshan Province, it ranks among the top five provinces in Huaguo, and a real power station can supply the electricity consumption of a province.
A controllable nuclear fusion reactor can supply such a huge amount of electric energy. From the outside world, it is unimaginable, but it is expected.
After all, it is a controllable nuclear fusion reactor, the legendary ultimate energy source, which can provide such a huge amount of electrical energy. Although it is surprising, it is also reasonable.
After briefly introducing the performance parameters of this controllable nuclear fusion reactor, Han Yuan ignored the audience in the live broadcast room. He began to direct the X-1 industrial robot to dismantle the brackets used for assembly and clean up the garbage on the site. wait for something.
The controllable nuclear fusion reactor and various power generation equipment have been assembled and deployed, and the next step is naturally to conduct power generation tests.
It is impossible for him to use it directly, and various necessary tests still need to be carried out.
Being able to skip the experimental reactor and build a commercial reactor directly, he had enough trust in the former host.
Of course, this has almost the same relationship with the materials left to him by the previous host and the format of knowledge information passed to him by the system.
As for the system, Won is still trustworthy.
It took two or three days, and under the busyness of many industrial robots, the support for assembling the reactor and all kinds of garbage in the reactor building have been cleaned up, including all kinds of boxes and tools.
The original messy reactor building looks much cleaner and tidy.
Standing on the highest floor of the plant and looking down, you can see a huge reactor lying on the ground like a doughnut.
Connected to the reactor are countless pipelines, most of which are used to generate electricity.
Some are connected to the magnetic fluid power generation equipment and paramagnetic spin power generation equipment in the floor, which can continuously convert the thermal energy provided by the controllable nuclear fusion reactor into electrical energy, and then output it to the entire base through the grid.
Some are used to import deuterium and tritium raw materials.
Another part is connected to the emergency device, waste discharge device and so on.
If we compare this reactor building to a person.
There is no doubt that the controllable nuclear fusion reactor located in the most central area is the heart, and every movement of the ultra-high temperature plasma in it brings vigorous energy to the whole body.
The central computer and intelligent core that control the magnetic mirror clamps and superconducting coils is the brain, which not only directs the flow of ultra-high temperature plasma, but also directs the operation and power output of the generator set.
Other devices are responsible for other parts of the human body.
For example, the liquid lithium circulation device arranged behind the first wall is like a lung, continuously providing new tritium raw materials, just like providing oxygen.
For example, the superconducting coils and magnetic mirror ferrules arranged on the controllable nuclear fusion reactor are like the arteries and veins of the human body, strictly controlling the flow of the 'blood' high-temperature plasma inside.
These things together form a colossus, making it glow with endless energy.
After cleaning up all the excess items in the reactor building, Won came to the control room.
Here, he can see everything in the entire controllable nuclear fusion park, every corner, including the cavity in the center of the fusion reactor, and as long as he wants, he can also see the data chart through the plasma detection technology.
All preparations and inspections had been done the day before.
Xiao Ling, who is in charge of controlling the entire park, checked every detail and confirmed that other equipment except the controllable nuclear fusion reactor can operate normally.
Including magnetic fluid power generation equipment and paramagnetic spin power generation equipment, they have all been tested for power generation through high-temperature plasma simulation equipment to ensure that there are no problems with the power generation unit and the power grid.
Now what Han Yuan has to do is to wait with the audience in the live broadcast room.
Almost all the rest will be done by Xiao Ling.
Manpower is sometimes poor at this moment is a best performance.
Although it can be said that he is now very strong both physically and mentally, but alone, he still cannot control the controllable nuclear fusion park, while artificial intelligence can.
(End of this chapter)
You'll Also Like
-
Hogwarts: Don't you all have the God's Eye?
Chapter 181 8 hours ago -
Pirates: Dark Smoker, never lose three times in a row
Chapter 217 8 hours ago -
Rebirth starts with rejecting childhood sweetheart and hanging out with a rich woman
Chapter 201 8 hours ago -
A Different World That Started as a Slave
Chapter 208 8 hours ago -
The beautiful girl vest system starting from Robin
Chapter 191 8 hours ago -
After being tricked into joining the Demon Sect, I created the Changsheng Family
Chapter 195 8 hours ago -
I asked you to take your sister to school, and you fell in love with the teacher.
Chapter 204 8 hours ago -
Quick Wear: When the Doomsday Boss is bound to the Childbearing System
Chapter 23 8 hours ago -
The girl who prayed for the evil god's attention
Chapter 10 8 hours ago -
Endless Breaking Limits, I am in Gaowu Heaven Rewards Hard Work
Chapter 164 8 hours ago