Guarantee
Sun Lien's "threat" was a great success, and Lin Yubin expressed a very strong willingness to cooperate.

As if to offer a congratulatory gift to this "threat", the resort manager finally sent a piece of good news—the helicopter of the Army Aviation Corps will arrive soon.

Due to the influence of the wind and snow, the helicopter cannot be shut down and waited at the landing point of the resort-it is quite difficult to restart the shut down helicopter engine without assistance on the ground.

At the same time, in order to avoid the changeable wind direction on the top of the mountain from affecting the safety of the aircraft, the pilots of the Army Aviation Corps did not choose the fastest suspension sling transfer plan-they decided to park the helicopter at the parking point and then maintain the speed at a critical speed. wait.

This is difficult, but not impossible, for Army helicopter pilots.They need to deal with the turbulence on the mountain carefully and respond to every change in wind direction in time.Only in this way can we ensure that the Warhawk and the comrades carried on it will not encounter danger.

The army green transport helicopter soon appeared over the landing point of the resort.Two waiters carried a stretcher and transported Lin Yubin to a room near the landing point.And Sun Li'en protected Lin Yubin all the way, and even put his own clothes on Lin Yubin's body.

There's a lot of filth on it, but for a patient with internal bleeding, the cold is the more dangerous thing—cold can cause the blood vessels on the patient's surface to constrict rapidly, causing blood pressure to rise.This move was originally a mechanism that humans evolved to preserve body temperature.But in the case of a patient who is bleeding internally, the most likely outcome of an increase in blood pressure is to burst through the wound and cause rebleeding.

Maintaining temperature is the basic condition for stabilizing the vital signs of patients.And many times, people tend to ignore the impact of this condition on people.

When the helicopter descended, it brought a violent sinking wind.Snowflakes were blown all over the sky, and after a few seconds, just after Sun Li'en and the others finally regained their sight, the dark green helicopter had already landed on the ground.The sliding door on the side of the fuselage opened, and two soldiers wearing helmets jumped out of the plane. After identifying the direction, they ran towards Sun Li'en.

·
·
·
On the square in front of the railway station, a group of people are busy.

Large trucks parked one by one in the area of ​​the station square where vehicles were not allowed to pass.Huge cranes are working continuously—they dismantle the many prefabricated houses loaded on the large trucks one by one, and reassemble and place them on the ground.

Due to the fear of sudden strong winds, the prefabricated house did not carry out vertical splicing, but adopted a simple flat-laying assembly method.While other staff are busy installing cold shelter equipment and power distribution facilities in the prefabricated house.

Although the prefabricated houses can shelter from the wind, most of the prefabricated houses are not very good at preventing cold and heat.But the time is limited. In order to divert the crowd as soon as possible, it is too late to carry out heat insulation treatment and renovation of the prefabricated houses.All they could do was seal the three windows of the original box-type prefabricated house with plywood, and then cut the top of the prefabricated house to make room for the forced exhaust fan.

The staff who are busier than installing the board room are the staff who install the circuit and the toilet.Their task is more complicated and more important than sealing and cutting. Electric heating and air heaters are installed in each prefabricated room, together with the plastic heat insulation curtain at the entrance, so that the temperature in the room can be kept in a relatively comfortable range.The minimum power of a fan heater is 1800W, which requires the temporarily built circuit to have sufficient carrying capacity and strength.Although in the emergency cleaning of the staff, there is no snow on the ground of the square.But in extreme weather, no one can guarantee that the power supply line will not be covered by heavy snow in the future. How to maintain high-intensity power supply and how to ensure the safety of the power supply line has become a big deal.

The bathroom problem is more realistic and urgent.Under the conditions of sufficient heat preservation measures and relatively comfortable conditions, the normal physiological response will make people increase the number of times they go to the toilet.

Crowded places are most likely to breed various diseases.The treatment of excrement is essentially as significant as enhancing ventilation and stationing medical service points in the prefab area.

This medical team undertakes very important tasks, and they need to undertake a considerable part of the material distribution and storage work.Including warm clothes, cold medicine and trauma first aid, etc. are their jobs.

At present, all the mobile public toilets have been gathered together for placement. After the installation of a total of [-] mobile public toilets is completed, the construction workers are laying non-slip carpets on the ground as quickly as possible, barely guaranteeing the toilet area first. In and out traffic.

Originally, according to the idea of ​​construction, they planned to build a batch of mobile awnings, and then connect them together to complete a sheltered passage from the board room to the toilet area.However, considering the intensity of subsequent snowfall and possible strong winds, this plan can only be temporarily abandoned.

As the main crowd diversion area of ​​the railway station, the square is expected to carry around 5 people.A prefabricated room can accommodate about 40 people for rest.However, it is physically impossible to make space in the station square of the railway station to complete the lifting and installation of 1250 prefabricated houses—there is not enough space.

According to the estimates of relevant departments, the square in front of the station can probably afford the placement of 800 mobile prefabricated houses-these prefabricated houses need to be separated, and power supply and fire protection need to be arranged, and sufficient traffic passages must be reserved.

Under this condition, it is not easy to complete the installation of 800 mobile prefabricated houses.To really complete the diversion of the crowd of 18 people, and continue to accommodate the surge of crowds two to three days after the traffic resumes, we have to find ways from other aspects.

Tents are set up, which can be used for passengers waiting for a short time to wait and rest.The houses around the train station have become more important diversion destinations.

Among the three medical teams of the Fourth Hospital, one was arranged in the hotel lobby next to the train station.

This medical team is the largest and undertakes the most difficult tasks.They carried a large amount of rescue equipment, and also opened up two rescue beds in the hotel lobby to prepare for receiving patients in need of first aid.Due to the superior location of the hotel, patients received by other medical teams and who need to be sent to the Fourth Central Hospital for treatment will be transferred here first, and then go to the Fourth Hospital through the ambulance parked outside the hotel.

The last medical team stationed in the train station.They consist primarily of respiratory and gastroenterologists, with a small group of emergency physicians.The indoor waiting environment is more comfortable than the outside world, and it is less prone to hypothermia or frostbite.However, factors such as long-term sedentary, irregular diet, and difficulty in rest due to mental stress can also easily induce diseases including asthma, colds, and enteritis.

The three medical teams were assigned different medical tasks.As the rear area, the Fourth Hospital is now operating at full capacity to protect the arduous task of the medical team.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like